Planning Inquiry Core Documents: A3 Recharge Scheme, Buriton
The closing day of the Public Inquiry will be live streamed at
10.00am on Tuesday 7 March 2023 from the link below
https://www.youtube.com/watch?v=6qZju-HrYiQ
Below are the Core Documents for the following Planning Inquiry:
A3 Recharge Scheme, Buriton
A – National Policy and Guidance
- 1. NPPF_July_2021
- 3. National_design_guide
- 4. DeliveringSustainableLowCarbonTravel
- 5. pb13387-vision-circular2010
- 6. industrial-strategy-white-paper-web-ready-version
- 7. road-to-zero
- 8. Over half of younger drivers likely to switch to electric in next decade – Office for National Statistics
- 9a Copy of nts0403
- 9a Copy of nts0403
- 9b Copy of nts9903
- 9b 9c Copy of nts9910
- 9c Copy of nts9910
- 10a veh0132
- 10a 10b veh0101
- 10b
- 11 The consumer experience at public chargepoints – GOV.UK
- 12 Electric vehicle charging device statistics_ October 2022 – GOV.UK
- 13. taking-charge-the-electric-vehicle-infrastructure-strategy
- 14. dft-ev-driver-survey-summary-report
B – Local Policy and Guidance
- 1. SD_LocalPlan_2019_17Wb
- 2 Inspectors-report-FINAL
- 3 State-of-the-National-Park-Report
- 4 Visitor-Accommodation-Review-Report
- 5 Sustainable-Tourism-Strategy-2015-20
- 6 SDNP-Partnership-Management-Plan-2014-19
- 7 SDNP-Special-Qualities
- 8 Viewshed-Study-Report
- 9 Employment-Land-Review-2015
- 10 Visitor-Survey-2015-Final-report
- 11 2018_SD_Visitor_Survey
- 12 Economic-Profile-of-the-South-Downs-National-Park
- 13 2020_economic_profile_up-dat
- 14 SD_PMP_2019_F_22-FINAL
- 15 Core-07-Ecosystem-Services-Technical-Advice-Note-non-householder
- 16 Sustainable-Construction-SPD-FINAL-25-Aug-2020
- 17 SDNPA-Climate-Change-Adaptation-Plan-Final-On-line-version
- 18 South-Downs-Visitor-Survey-2021-Final-report
- 19 DNS-TAN-2021-Main-Document-External-Lighting
- 20 Final-Camping-Glamping-TAN-for-publication-08.07.21
- 21 Appendix-2_Parking-SPD_Accessible
- 22 Biodiversity-Net-Gain-Technical-Advice-Note-TAN
- 23 SD_Design_2022_23-web-legible
- 24 South Downs Way – South Downs National Park Authority
- 25 2017-AMR
- 26 AMR-2018
- 27 Final_AMR_2019
- 28 LIVE-AMR-2020-New-21.01
- 29 Authority-Monitoring-Report-2020-to-2021
- 30 Authority-Monitoring-Report-2021-2022
- 31 LIVE-AMR
- 32. South-Downs-Appendix-K-Greensand-Terrace – ADDITIONAL
- 33. A Buriton Village Design Statement
- 33. B Buriton_VDS_Appendices-Compressed
- 33. C Buriton-VDS-Adoption-Statement
C – Industry Guidance
- 3 ilp-guidance-note-8-bats-and-artificial-lighting-compressed
- 4 GN01_-_ILP_Guidance_Note_1_the_reduction_of_obtrusive_light_-_2021_v2-60iqak
- 5 IDSR-Guidelines-2018
- 6 landscape-character-assessment
- 7 68-guidelinesforlandscapeandvisualimpactassessment-_3rd-edition_2013
- 8 20-1-Reviewing-LVIAs-and-LVAs-Final
- 9 COASTAL-WEST-SUSSEX-HOTEL-VISITOR-ACCOMMODATION-DEVELOPMENT-OPPORTUNITIES
- 10 gb_tourist_annual_report_2019_final
- 11 FROM-SURVIVAL-TO-RECOVERY
- 12 COVID-19-FROM-SURVIVAL-TO-RECOVERY-UPDATE-8-JANUARY-2021
- 13 Hotel-Britain-2022-Report
- 14 20190329-NG-EV-CHARGING-BEHAVIOUR-STUDY-FINAL-REPORT-V1-EXTERNAL
- 15 Global_EV_Outlook_2020
- 16 GlobalEVOutlook2021
- 17 FES 2021 – print optimised V01
- 18 Average Electric Car Range in the UK 2023 _ NimbleFins
- 19 Renault Zoe ZE50 R110 (2020-2022) price and specifications – EV Database
- 20 UKPN cost and timescales
- 21 Electric vehicle range – how far can I drive in an EV_ _ RAC Drive
- 22 SMMT-EV-Infrastructure-Position-Paper-FINAL
- 23 UK electric vehicle charge point networks ranked 2021-22 – Zap-Map
- 24 How many electric charging points in the UK 2023 – Zap-Map
- 25 Green Recovery __ National Park Sustainability
- 26 9000 UK Charging Points _ bp pulse membership and app
D – Application Documents
- 1 APPLICATION_FORM-1601813
- 2 CIL_QUESTIONS-1601832
- 3 COVER_LETTER_DATED_22_DECEMBER_2021-1601938
- 4 SITE_LOCATION_PLAN-1601771
- 5 EXISTING_SITE_BLOCK_PLAN-1601773
- 6. SDNP_21_06431_FUL-PROPOSED_MASTER_PLAN-1601897
- 7 SITE_LAYOUT_PLAN-1601775
- 8. SITE_LEVELS_PLAN-1601776
- 9 SITE_SECTIONS_PLAN-1601777
- 10 SITE_ELEVATIONS_PLAN-1601778
- 11 1_BED_ECO_LODGES_FLOOR_PLAN-1601779
- 12 1_BED_ECO_LODGES_ELEVATION_PLAN-1601780
- 13 ECO_LODGES_TYPE_A_FLOOR_AND_ROOF_PLAN-1601781
- 14 ECO_LODGES_TYPE_B_FLOOR_AND_ROOF_PLAN-1601782
- 15 ECO_LODGES_TYPE_A_ELEVATIONS_PLAN-1601783
- 16. ECO_LODGES_TYPE_B_ELEVATIONS_PLAN-1601784
- 17. SDNP_21_06431_FUL-EARTH_SHELTERED_BUILDING_PLAN_AND_SECTION-1601833
- 18 EARTH_SHELTERED_BUILDING_1_PLAN-1601785
- 19 EARTH_SHELTERED_BUILDING_2_PLAN-1601786
- 20 EARTH_SHELTERED_BUILDING_3_PLAN-1601787
- 21. EARTH_SHELTERED_BUILDING_4_PLAN-1601788
- 22. EARTH_SHELTERED_BUILDING_5_PLAN-1601791
- 23 EARTH_SHELTERED_BUILDING_-_CAFE_DETAILS_PLAN-1601792
- 24 EARTH_SHELTERED_BUILDING_-_E-CAR_SHOP_DETAILS_PLAN-1601793
- 25 EARTH_SHELTERED_BUILDING_-_FARM_SHOP_DETAILS_PLAN-1601794
- 26 BURITON_1001_AERIAL-1601818
- 27 BURITON_1002_AERIAL_CLOSE_UP-1601819
- 28 BURITON_1003_ARCHES-1601820
- 29. BURITON_1004_INTERNAL_FARM_SHOP-1601821
- 30 BURITON_1005_ACROSS_MEADOW-1601822
- 31. BURITON_1006_RAISED_WALKWAY-1601823
- 32 BURITON_1007_BALCONY-1601824
- 33. BURITON_1008_BALCONY_ALT_BG-1601825
- 34 – DAS Recharge One at the Buriton A3 interchange DAS_12.20 (1)
- 35 EXECUTIVE_SUMMARY_PLANNING_STATEMENT-1601770
- 36 BURITON_SCHEDULE-1601817
- 37 RETAIL_LEISURE_AND_COMMUNITY_FACILITIES_ASSESSMENT-1601926
- 38 – Statement of Community Involvement
- 39 PRELIMINARY_ECOLOGICAL_APPRAISAL-1601901
- 40 STRATEGIC_TRAFFIC_MANAGMENT_SCHEME-1601896
- 41 FEASIBILITY_STUDY_BURITON-_BIOCNG_POWERED_FUEL_CELL_CHPS_FOR_EV_CHARGING-7-FINAL-1601891
- 42 ECOSYSTEM_SERVICES_STATEMENT-1601828
- 43 BAT_ACTIVITY_AND_REPTILE_PRESENCE_ABSENCE_SURVEY_REPORT-1601826
- 44 ARBORICULTURAL_METHOD_STATEMENT-1601814
- 45 TREE_CONSTRAINTS_PLANS_NOV_2021-1601928
- 46 TREE_CONSTRAINTS_PLANS_DEC_2021-1601929
- 47 ENERGY_AND_SUSTAINABILITY-1601811
- 48 NOISE_AND_VIBRATION_IMPACT_ASSESSMENT-1601810
- 49a VOLUME_1_LANDSCAPE_AND_VISUAL_EVIDENCE-1601800
- 49b VOLUME_2_LANDSCAPE_AND_VISUAL_IMPACT_ASSESSMENT-1601808
- 50 LANDSCAPE_PROPOSALS_PLAN-1601809
- 51 ILLUSTRATIVE_LANDSCAPE_PLAN-1601798
- 52 ILLUSTRATIVE_LANDSCAPE_SECTION_PLAN-1601799
- 53 ECONOMIC_BENEFITS_INFOGRAPHICS-1601797
- 54 HERITAGE_ASSESSMENT-1601796
- 54a ARCHAEOLOGY_AND_PLANNING_SOLUTIONS_PLANS-1601795
- 55a FRA_1-29-1602393
- 55b FRA_30-1602392
- 55c FRA_31-41-1602389
- 55d FRA_42-1602388
- 55e FRA_43-53-1602387
- 55f FRA_54-78-1602386
- 56a TRAVEL_ASSESSMENT_1-50-1602385
- 56b TRAVEL_ASSESSMENT_51-78-1602383
- 56c TRAVEL_ASSESSMENT_79_-_80-1602382
- 56d TRAVEL_ASSESSMENT_81-85-1602381
- 56e TRAVEL_ASSESSMENT_86-89-1602380
- 56f TRAVEL_ASSESSMENT_90-100-1602379
- 56g TRAVEL_ASSESSMENT_100-138-1602378
- 56h TRAVEL_ASSESSMENT_139-140-1602377
- 57a TRAVEL_PLAN_STATEMENT_1-34-1602372
- 57b TRAVEL_PLAN_STATEMENT_35-39-1602356
- 57c TRAVEL_PLAN_STATEMENT_40-42-1602355
- 57d TRAVEL_PLAN_STATEMENT_43-1602354
- 57e TRAVEL_PLAN_STATEMENT_44-45-1602353
- 57f TRAVEL_PLAN_STATEMENT_46-47-1602352
- 58 DESIGN_AND_ACCESS_STATEMENT-1618054
- 60 PLANNING_STATEMENT-1635431
- 61 REBUTTAL_FROM_APPLICANT_RE__LANDSCAPE_COMMENTS-1652364
- 62 Updated SCI
- 64 SDNP_21_06431_FUL-TECHNICAL_NOTE-1652873
- 65 SDNP_21_06431_FUL-LIGHTING_STRATEGY-1652870
- 65a SDNP_21_06431_FUL-HORIZONTAL_ILLUMINANCE_LUX_1_OF_2-1652871
- 65b SDNP_21_06431_FUL-HORIZONTAL_ILLUMINANCE_LUX_2_OF_2-1652872
- 66 ES Chapter 1 Introduction
- 67 ES Chapter 2 Planning Policy
- 68 ES Chapter 3 Baseline Conditions
- 69 ES Chapter 4 The Proposed Development
- 70 ES Chapter 5 Assessment Methodology
- 71 ES Chapter 6 Construction Environmental Management
- 72 ES Chapter 7 Air Quality
- 73 ES Chapter 8 Archaeology and Cultural Heritage
- 74 ES Chapter 9 Energy, Sustainability and Climate Change
- 75 ES Chapter 10 Ecology and Biodiversity
- 76 ES Chapter 11 Landscape and Visual Impacts
- 77 ES Chapter 12 Lighting
- 78 ES Chapter 13 Noise and Vibration
- 79 ES Chapter 14 Socio-Economics and Health
- 80 ES Chapter 15 Soils, Geology and Contamination
- 81 ES Chapter 16 Traffic and Transport
- 82 ES Chapter 17 Water Resources and Flood Risk
- 83 ES Chapter 18 Summary and Conclusions
- 84 ES Appendix 1.1 Concept Masterplans
- 85 ES Appendix 4.1 Biomethane Supply Report
- 86 ES Appendix 4.2 Feasibility Study
- 87 ES Appendix 4.3 Arboricultural Constraint Assessment
- 88 ES Appendix 4.4 Statement of Community Involvment
- 89 ES Appendix 4.5 Pre-application Enquiry
- 90 ES Appendix 7.1 Air Quality Assessment
- 91 ES Appendix 8.1 Heritage Statement
- 92 ES Appendix 9.1 Energy and Sustainability Chapter
- 93 ES Appendix 10.1 Buriton Peliminary Ecology Appraisal
- 94 ES Appendix 10.2 Bat activity and Reptile Survey
- 95 ES Appendix 10.3 Biodiversity Impact Calculations
- 96 ES Appendix 10.4 Ecosystem Services Statement
- 97 ES Appendix 11.1 Landscape Figures
- 98 ES Appendix 11.2 Landscape Baseline Table
- 99 ES Appendix 11.3 Verified Photomontages
- 100 ES Appendix 11.4 LVE Assessment Methodology
- 101 ES Appendix 12.1 Lighting Strategy
- 102 ES Appendix 12.2 Indicative Lighting Zone Diagram
- 103 ES Appendix 12.3 Identified Potential Receptors Map
- 104 ES Appendix 12.4 Obtrusive LIght Calculations
- 105 ES Appendix 12.5 Pre Curfew Indicative Light Spill Diagram
- 106 ES Appendix 12.6 Post-Curfew Indicative Light Spill Diagram
- 107 ES Appendix 12.7 Luminaire Locations Where Back Light Shields Are Required
- 108 ES Appendix 12.8 Software Simulation Images Showing the Proposed Development’s Lighting
- 109 ES Appendix 13.1 Glossary of Acoustic Terminology
- 110 ES Appendix 13.2 Policy, Standards and Guidance
- 111 ES Appendix 13.3 Noise Assessment Assumptions
- 112 ES Appendix 13.4 Measures Noise Levels
- 113 ES Appendix 14.1 Health Impact Assessment
- 114 ES Appendix 14.2 Retail, Leisure and Community Facilities Assessment
- 115 ES Appendix 14.3 Economic Benefits Infographics
- 116a ES Appendix 15.1 Preliminary Investigation Report Part 1
- 116b ES Appendix 15.1 Preliminary Investigation Report Part 2
- 116c ES Appendix 15.1 Preliminary Investigation Report Part 3
- 116d ES Appendix 15.1 Preliminary Investigation Report Part 4
- 116e ES Appendix 15.1 Preliminary Investigation Report Part 5
- 116f ES Appendix 15.1 Preliminary Investigation Report Part 6
- 117 ES Appendix 16.1 Transport Assessment
- 118 ES Appendix 16.2 Framework Travel Plan Statement
- 119 ES Appendix 17.1 FRA and Drainage Strategy
- 120 ES NTS
- ES Appendix 10.3a Biodiversity Impact Calculations Sheet
E – Appeal Documents
- 1 – Committee report
- 2 – Tourism response
- 3 – Decision Notice
- 4 – 01 APPEAL FORM – 821147
- 5a Buriton Statement of Case (2)
- 5b Buriton SoC Annex 1 (3)
- 6a SDNPA Statement of Case (1)
- 6b Appendix 1 – SDNPA Direction
- 6c Appendix 2 – Highways Authority response POST DECISION
- 7a redacted
- 7b Appeal – letter 6.12.22 (00000005)
- 7c Appeal reference
- 7d redacted
- 7e 3rd – Mullenger R
- 7f redacted
- 8 Buriton – planning SOCG
- 9 Buriton – SoCG (ecology) (1)
- 10 1954-DFL-ELG-XX-RP-EO-13007-S3-P04 (1)
- 11 SOCG (Landscape) 17.01.23 (1)
- 12 ITL15608-013B R Transport and Highways Statement of Common Ground [final signed] (1)
- 13 – Stage 1 RSA and ITL15608-004 TN S1 RSA (Site Access) Response Report
- 14 – ITL15608-009 TN Planning Application Highways Response
- 14. dft-ev-driver-survey-summary-report
- 15 – Land North of A3 Junction The Causeway Petersfield HA Response
- 16 – ITL15608-GA-001G
- 17 – ITL15608-010 TN Outline Car Park Management Plan
- 20 Appeal Decision – 3291160 (2)
- 21 – Appeal Decision 3296946 (2)
F – SDNPA Evidence
- 1 Summary Proof of Evidence – Richard Ferguson (Planning)
- 1a planning proof
- 2 Summary Proof of Evidence (landscape matters) – Ms Ruth Childs
- 2a landscape
- 3 Proof of Evidence – Mr Dan Oakley (Dark Night Skies matters)
- 4 Summary Proof – Mr Waller Gutierrez (Design matters)
- 4a Proof of Evidence – Mr Waller-Gutierrez (Design matters)
- 5 SouthDownsNP_IDSR_app
- 6. Rebuttal Proof of Evidence – Richard Ferguson SDNPA – final version
- 7. Landscape Rebuttal RC
Rebuttal Appendices
- Amberley – Screening opinion with site plan – rebuttal appendix 7
- Braintree Decision Notice – rebuttal appendix 6
- Braintree site layout – rebuttal appendix 6
- Buckmore Farm – design principles rebuttal appendix 4
- Cowdray Park treehouses Highfield Copse – rebuttal appendix 8
- Cowdray Park treehouses Lodge Wood -rebuttal appendix 8
- Lower Slaughter – Location Plan – rebuttal appendix 3
- Lower Slaughter – Site Plan – rebuttal appendix 3
- Marwell original scheme – rebuttal appendix 5
- Matts Hill – site location plan- rebuttal appendix 2
- Matts Hill – Site Plan – rebuttal appendix 2
- Matts Hill Appeal Site- aerial – rebuttal appendix 2
- Pre-app covering email submission – rebuttal appendix 1
- Pre-app form- rebuttal appendix 1
- red line plan – rebuttal appendix 1
Landscape Appendices
- LANDSCAPE Rebuttal Appendix 1 Site boundaries
- LANDSCAPE Rebuttal Appendix 2 A3 Experience
- LANDSCAPE Rebuttal Appendix 3 Boundary Measurements
- LANDSCAPE Rebuttal Appendix 4 Consultee Arborist Advice
- LANDSCAPE Rebuttal Appendix 5 Area Schedule
- LANDSCAPE Rebuttal Appendix 6 120 Wealden Greensand NCA
G – Appellant Evidence
- 1 Hepher Buriton Summary Proof 24 Jan
- 2 Hepher Buriton Main Proof 24 Jan
- 3 Bill Dunster summary proof of evidence
- 4 Bill Dunster proof of evidence
- 5 Landscape and Visual Impact Proof – summary
- 6 Landscape Proof
- 7 Proof of Evidence – Ecology (Paul Whitby)
- 8a Soil Map
- 8b – Soil Data Interpretation
- 8c – soil testing location 1 20220817_2129282_1
- 8d – soil testing location 2
- 8e – Soils – Natural England Guidance
- 9- Chalk Grassland Method Statement Recharge One
- 10 Daniel Spreadborough summary
- 11 Daniel Spreadborough Proof of Evidence
- 12 – Simon Ward summary
- 13 – Simon Ward Proof
- 13 a – Simon Ward Proof Appendix 4
- 14 Arcadis EV Charging Proof of Evidence Executive Summary
- 15 Arcadis EV Charging Proof of Evidence
- 16 Simon Lester proof of Evidence
- 17 Amit Roy Proof of Evidence
- 18 ITL15608-015 Summary PoE Transport Highways and Accessibility Neil Marshall
- 19 ITL15608-014b PoE Transport Highways and Accessibility Neil Marshall
- 20 Verified Views
- 21 AY001 South Downs_Hayes Davidson Methodology
- 22 AY002 South Downs_Winter Photography_Hayes Davidson Methodology
- 23.Hepher Buriton Rebuttal Proof 14 Feb v1.1a
- 24. AY002_South Downs_Timelapse
- 24. Lionel Fanshawe Final Draft Rebuttal proof
- 25. Daniel Spreadborough Rebuttal
- 26. EV Charging Supplementary Proof of Evidence on behalf of Re-Charge One Limited 140223 v0.1
- 27.Simon Lester rebuttal SDNP s106 140223_optimised for DMS
Landscaping Appendices
- Appendix A LVIA Vol 1 20221220 with Rev Fig 4 compressed
- Appendix B LVIA Vol 2
- Appendix D Photomontage AY002_South Downs_Visual Impact Assessment_A1 compressed
- Appendix E Precedent images of chalk grassland habitat
- Appendix G Cross section from quarry restoration
- Appendix H 1992 A3 bypass construction Photograph
- Appendix I Table of assessment against SDNPA Seven Special Qualities
- Appendix J EIA ES Chapter 11 – Landscape and Visual Impacts 20211222
- Appendix K Tree Report
- Appendix L Landscape proposals P06
- Appendix M Illustrative Plan
- Appendix N Illustratve Section
- Appendix O – SDNP 7 Special-Qualities
- Appendix P Wallingford Appeal Decision 2017
- Appendix Q Landscape proposals P07
Inquiry Documents
- ID1(a) – Appellant’s Opening Submission
- ID1(b) – SDNPA Opening Submission
- ID2 – SDNPA design and dark night skies consultee comments
- ID3 – CPRE Statement
- ID4 – Mr Fanshawe comments – boundary trees
- ID5 – SDNPA comments on Screening Opinion
- ID6 – Initial draft conditions with Appellant’s comments
- ID7 – Professional Lighting Guide 04
- ID8 – Kingsmead Site Details (Mr Ferguson Proof of Evidence Appendix 4)
- ID9 – Trimmingham Site Details (Mr Ferguson Proof of Evidence Appendix 4)
- ID10 – Photomontage comments from Appellant
- ID11 – SDNPA Statement – Schedule Monument
- ID11a – Statement from Mr Bird (The Nest Hotel)
- ID12 – SDNPA Screening Opnion – Butser SAC
- ID13 – CitiCharge Letter – RechargeOne
- ID14 – SDNPA Landscape Character Assessment Extract
- ID15 – SDNPA arboricultural advice
- ID16 – Website extract – National Highways and Ash Die Back
- ID17 – Plans and images from Appellant – Mr Fanshawe evidence
- ID18 – Executive Summary – Beyond Energy ‘Monetising Biomethane’s Whole System Benefits’ Feb 2023
- ID19 – The Ecology Group note 21.02.23
- ID20 – SDNPA pre-application advice – Coldwaltham
- ID21 – Area schedule – Appellant’s response
- ID22 – Welcome Break sketches (a 2019 pre-application design iteration)
- ID23 – S106 Addendum
- ID24 – Petersfield-Society-Redacted
- ID25 – Updated landscape drawing – Mr Fanshawe
- ID26 – Mr B Harverson Proof-20-Feb